I am running a list of tests from an Excel file that could be a DMM or Scope test or neither. I am creating a session of each at the beginning, setting up the device before measurement and disabling them after making a reading then set up the device before next reading. I thought this would be quicker than closing and initializing around each test. Is this an efficient way or is there a better way?
↧